06.1 ° Service 06 / Software Development · Quality Engineering

Test automation.
From strategy to pipeline.

Test automation means that automated tests run with every change to your software and show whether the application still behaves as agreed. As quality engineering, we take on the work behind it. Together with you, we define what is verified at which test level, automate unit, integration, and load tests, and integrate them into your CI/CD pipeline. The experience comes from integration projects. For a booking portal, MUnit, Karate, and JMeter ran in the pipeline, and no connector went live without passing the certification suite.

Tagline Test strategy · Unit tests · Integration tests · Load tests · Pipeline
° dl / service-06.1
° Fundamentals · Test automation

What is test automation, and which test levels are there?

Test automation hands the execution and evaluation of tests over to software. This section clarifies the term, puts test levels and the test pyramid in context, and shows how quality engineering and quality assurance relate to each other.

Test automation means that a program executes and evaluates tests. To do so, it calls the application with defined inputs, compares the result with the expected one, and reports every deviation. Once written, such a test can be repeated as often as needed, in the same order and with the same data. Regression tests are particularly well suited. They confirm that a change has not affected anything elsewhere and are run again with every new version. The benefit lies in fast feedback, because a defect becomes apparent shortly after the change that caused it. That is a prerequisite for delivering software at short intervals. On the other side is the effort of writing the tests and maintaining them together with the application. The test strategy defines which tests justify this effort.

Which test levels are there?

For software testing, the ISTQB Certified Tester syllabus describes five test levels. Component testing, also called unit testing, verifies individual building blocks in isolation. Component integration testing verifies the interfaces and the interaction between components. System testing looks at the behavior of the entire system, and system integration testing at its interfaces to other systems and external services. Acceptance testing shows whether the system meets the needs of the business. The test types cut across these levels. Functional tests verify what a system does, and non-functional tests verify how well it does it. A load test is a non-functional test. It measures how the application behaves under many concurrent calls.

The test pyramid, with many fast tests and few broad ones

The test pyramid is a model for how automated tests are distributed across the layers of an application. Mike Cohn described it in 2009 in his book “Succeeding with Agile” with the three layers of unit tests, service tests, and UI tests. Tests in the bottom layer are small, isolated, and fast. Each one verifies a small piece of functionality, which is why many of them are needed. The top layer consists of end-to-end tests, which run through a large part of the application and take longer, so a few of them are enough. The number and names of the layers differ depending on the presentation. For test automation, the model sets a direction. Whatever can be verified at a lower level is verified there.

Quality engineering and quality assurance

Software testing and quality assurance are often treated as the same thing, but they mean different things. The ISTQB syllabus describes testing as a product-oriented, corrective approach that evaluates the product and uncovers defects. Quality assurance, by that definition, is a process-oriented, preventive approach that improves the processes in development and testing. Quality engineering is our name for the service that combines both in day-to-day development. It includes a test strategy, automated tests at every level, checks in the pipeline, and acceptance criteria that are settled before implementation. Our article Quality Assurance in Agile Software Development describes how quality assurance is anchored in agile teams. We offer test automation for custom software, with a focus on Java. The project examples on this page come from integration projects on the Anypoint Platform, whose Mule runtime runs on the JVM.


° Four levels

What is verified automatically at which level.

Unit tests, integration tests, end-to-end tests, and load tests each answer a question of their own, and a different kind of tool works at each level. We align test automation with these four levels.

01

Unit tests

They verify individual building blocks in isolation and give fast feedback. This is where unit test frameworks such as JUnit work, and MUnit for Mule applications. For the tariff comparison calculator of an energy utility, every calculation rule received its own test cases.

02

Integration tests

They verify, at the interfaces, the interaction of components and the connection to other systems. API testing tools send calls and check the responses. In our projects, we have used Karate for this.

03

End-to-end tests

They run through a business flow from start to finish, through the API or through the user interface. For the user interface, browser automation tools drive the application. A few deliberately chosen flows are enough.

04

Load tests

They measure how the application behaves under many concurrent calls. Load generators such as JMeter and Gatling produce these calls and record response times and errors. Load tests run selectively, for example ahead of an expected peak.

° Platform · Building blocks

What we implement for your test automation

Six building blocks, from the test strategy to the load test. The project examples come from integration projects.

°01 · Foundation
Test strategy
What is verified at which test level, what is automated, and what stays manual? The strategy records this before the first tests are written.
Test levels · Test types · Acceptance criteria
°02 · Selection

What is worth automating

Regression tests run again with every change and are therefore particularly well suited. Exploratory testing and acceptance by business users remain tasks for people.

°03 · Interfaces

Integration tests per interface

Automated tests verify every interface against the agreed behavior. At a press company, Karate tests safeguarded every route before it went live.

°04 · Pipeline
CI/CD
The tests run in the pipeline with every change. At a payment provider, every change passed through build, MUnit tests, and deployment.
°05 · Test data

Test data in a defined state

An automated test needs the same starting point on every run. We define where test data comes from and how it is made available before each run.

°06 · Load
Load tests
Load tests reproduce expected peaks in advance. For a lottery company, JMeter and Gatling reproduced the peaks around the announcement of the results before they occurred.
° Standards and regulations that touch on testing
As of November 2026
ISO/IEC/IEEE 29119
Series of standards on software testing covering concepts, test processes, documentation, and test techniques
ISTQB
Certified Tester syllabus for test levels, test types, and consistent terminology
ISO/IEC 25010
Quality model for software, with characteristics such as reliability and maintainability
DORA
Testing of ICT systems at financial entities (Art. 25)
NIS2
Assessing the effectiveness of cybersecurity measures (Art. 21)
GDPR
Principle of data minimization (Art. 5), relevant for test data
° Starting points

Six starting points for test automation.

Six situations in which test automation is a good fit, and how we approach them. The project examples come from integration projects on the Anypoint Platform.

01

Every release is checked by hand  · Regression tests

With every new feature, the list of what has to be checked again before a delivery grows. The effort per release increases, and the interval between deliveries gets longer.

Our approach. We automate the checks that repeat with every change and start with the flows that carry the most business weight. After that, the tests run with every change.

02

The application depends on other systems  · Integration tests

ERP, CRM, and partner systems supply data or receive it. If one side changes, this only shows in the interaction.

Our approach. Every interface receives automated integration tests. For a booking portal, there was a defined test catalog for each connected system, and every new connection went through the same certification process. The API Design page shows how tests are derived from the specification of an API.

03

A load peak is coming up  · Load tests

A cutoff date, a campaign, or a year-end closing brings many concurrent requests, and how the application will behave then is an open question.

Our approach. Load tests reproduce the expected peak in advance. For a lottery company, we did this with JMeter and Gatling ahead of the announcement of the results. This was complemented by tuning the services with a profiler.

04

Tests still run outside the pipeline  · CI/CD

Automated tests exist, but they are started by hand. Whether a change has been verified depends on who remembered to do it.

Our approach. The tests become fixed steps of the pipeline, and their result decides whether a change moves on to the next environment. At a payment provider, every change ran through Jenkins and GitLab pipelines with build, MUnit tests, and deployment.

05

Tests deliver varying results  · Test data

The same test passes today and fails tomorrow because the data in the test environment has changed.

Our approach. We define which data a test requires and set it up before every run. When throughput is the question, the real order of magnitude counts. During the archive migration of an image agency, testing used real data volumes, and the throughput of each process step was measured.

06

It is unclear when something is done  · Acceptance criteria

Business teams and development have different ideas of when a feature can be accepted.

Our approach. Acceptance criteria are settled before implementation and, where possible, formulated as automated tests. For a lottery company, we defined acceptance criteria that determine when an API is done.

° Approach

From the assessment to tests in the pipeline

Four steps in which we introduce test automation or expand an existing one. Each ends with a result that stands on its own.

01

Assessment

Record the application, interfaces, existing tests, and pipeline. Document where defects would affect the business the most.

02

Test strategy

Define test levels, test types, test data, and acceptance criteria. Decide what is automated and what stays manual.

03

Implementation

Automate tests per level, provide test data, and integrate the tests into the pipeline as fixed steps.

04

Expansion & handover

Cover further areas and run load tests ahead of expected peaks. Documentation and knowledge go to your team.

° In depth · Automation and pipeline
As of 2026  ·  3 min read

Test automation and manual testing, tests in the pipeline, load tests.

Two questions come up in every test automation initiative. What is automated, and what do people continue to verify? And how do the tests get into the CI/CD pipeline so that they run with every change and provide answers ahead of a load peak?

01

Test automation and manual testing

An automated test runs the same way every time, with the same steps, the same data, and the same expected result. Among the benefits, the ISTQB syllabus names relief from repetitive manual work, greater consistency, and faster feedback. It also names the effort of introducing the tools and maintaining the test scripts. For the selection, this means automating what repeats often and has an unambiguous expected result.

Manual testing keeps its place. Exploratory testing, the assessment of usability, and acceptance by the future users rely on human judgment. The two complement each other, because automation takes over the recurring checks and the specialists gain time for the cases that call for experience. The overview of the four levels further up shows which kind of tool works at which test level. For assertions in Java tests, our article Hamcrest presents a library for readable matchers.

  • °
    Automated   Regression tests, interface tests, and load tests that recur and have an unambiguous expected result.
  • °
    Manual   Exploratory testing, usability, and acceptance by the users.
02

Tests in the CI/CD pipeline and load tests ahead of peaks

In the pipeline, tests become fixed steps between build and deployment. Fast unit tests run with every change, followed by integration tests against a test environment. Their result decides whether a change moves on. At a booking portal, MUnit, Karate, and JMeter ran in the CI/CD pipeline, and no connector went live without passing the certification suite. At an energy utility whose solution architecture we are responsible for, every change passes through GitLab pipelines with SonarQube. The article What Are Build Pipelines? explains how a pipeline is structured. Pipelines and delivery are covered on the DevOps Consulting page.

Load tests follow a rhythm of their own. They need an environment that comes close to production, and they run selectively ahead of an expected peak or after larger changes. A lottery company sees its peaks around the announcement of the results. Load tests with JMeter and Gatling reproduced these peaks before they occurred. For Mule applications, the Development & Connectors and DevOps & Deployment pages describe testing with MUnit, and the Migration & Performance page covers load tests and tuning. The Software Modernization page shows how tests safeguard a restructuring.

  • °
    In the pipeline   Unit and integration tests as fixed steps, with every change.
  • °
    Ahead of load peaks   Load tests in a production-like environment before the peak occurs.
° From our integration projects
5+
hotel and partner systems connected,
with a defined test catalog per system
Karate
Integration tests per route,
at a press company
20
Mule services of a payment provider,
every change with MUnit tests
Load tests
with JMeter and Gatling ahead of the
announcement of the results
° Frequently asked questions about test automation

Questions and answers on test automation and quality engineering.

01 What is test automation?

Test automation means that software executes and evaluates tests. An automated test calls the application with defined inputs, compares the result with the expected one, and reports deviations. It can be repeated as often as needed and usually runs in the CI/CD pipeline with every change. The term automated testing is also common.

02 What is the difference between test automation and manual testing?

In manual testing, a person carries out the steps and assesses the result. In test automation, a program does this. Automated tests are suited to checks that repeat often and have an unambiguous expected result, above all regression tests. Exploratory testing, the assessment of usability, and acceptance by the users remain manual. In practice, the two complement each other.

03 Which test levels are there, and which tests can be automated?

The ISTQB syllabus describes five test levels, from component testing (unit testing) through component integration testing, system testing, and system integration testing to acceptance testing. Tests can be automated at all levels. Unit tests and integration tests usually run in the pipeline with every change, and end-to-end tests cover selected flows. Load tests are non-functional tests and run selectively, for example ahead of an expected peak. In test automation, our tools include Playwright for browser and end-to-end tests, Gherkin for describing test cases, and Tricentis Tosca for business applications.

04 What is quality engineering, and how does it differ from quality assurance?

According to the ISTQB syllabus, quality assurance is a process-oriented, preventive approach that improves the processes in development and testing. Testing evaluates the product and uncovers defects. We use quality engineering to describe the technical implementation of both. It includes the test strategy, automated tests, checks in the pipeline, and acceptance criteria as part of development. Our article Quality Assurance in Agile Software Development describes the fundamentals.

05 How is test automation integrated into a CI/CD pipeline?

The tests become fixed steps of the pipeline. After the build, the unit tests run, followed by integration tests against a test environment. Their result decides whether the change reaches the next environment. At a payment provider, every change ran through Jenkins and GitLab pipelines with build, MUnit tests, and deployment. Pipelines and delivery are covered on the DevOps Consulting page.

06 Who introduces test automation, and what does consulting on it cover?

dataliquid is a service provider that introduces test automation for custom software, working from Hamburg. The consulting covers the assessment, a test strategy, and the implementation with automated unit, integration, and load tests, test data, and integration into your pipeline. The focus is on Java applications and interfaces. Our documented projects are integration projects, including work for a booking portal, a lottery company, a press company, and a payment provider. Your team works alongside us and takes over the tests at the end.

Test Automation

Let's talk about your test automation.

In the initial call with an engineer, we discuss your application, your current tests, and a sensible first step.

01 Submit a request
* Required field
Topic
Encrypted transmission · TLS 1.3